Portfolio

Our Projects

Landmark infrastructure projects that define our legacy and showcase our expertise.

Filter by category 👇

Upgrading of Mechi-Ratuwa Road, Jhapa (CH 0+000 to CH 13+000) Package 1
Roads
Jhapa 55 months

Upgrading of Mechi-Ratuwa Road, Jhapa (CH 0+000 to CH 13+000) Package 1

Client: Postal Highway Directorate

Comprehensive upgrading of the Mechi-Ratuwa road section in Jhapa. This major infrastructure project involves massive earthworks, bituminous surfacing, and extensive concrete work to enhance regional connectivity. Major works: Bituminous works (DBM & Asphalt), Sub-grade, Sub-base, Base course, and Plum concrete works.

RoadsView Details
Kathmandu-Terai Fast Track (Expressway) - Lot 14
Expressway
Kathmandu-Terai 34 Months

Kathmandu-Terai Fast Track (Expressway) - Lot 14

Client: Kathmandu-Terai/Madhesh Fast Track (Expressway) Road Project

Roadway Excavation, Roadway Embankment construction, composite soil Reinforcement system, Cross Drainage structure and other structure's construction. This section involves massive earthworks in challenging terrain.

ExpresswayView Details
Civil Works for Shuba Shree Agni Cement Industry
Industrial
Pyuthan / Arghakhanchi 38 months

Civil Works for Shuba Shree Agni Cement Industry

Client: Shuba Shree Agni Cement Pvt. Ltd

Excavating stone, collection and Transportation of Limestone from Pyuthan District, Phopli VDC to Arghakhachi Disrict, Jaluke-6, Shuvashree Agni Cement Industries Pvt. Ltd. Includes significant infrastructure development at the factory site.

IndustrialView Details
Construction of Nine School Buildings, Ramechhap
Institutional
Ramechhap 30 months

Construction of Nine School Buildings, Ramechhap

Client: Government of Nepal

Construction of School Buildings, Toilet and water supply facilities including site Development works in Nine (9) Schools in Ramechhap District. Built to modern earthquake-resistant standards.

InstitutionalView Details
Kathmandu-Terai Fast Track (Expressway) - Lot 04
Expressway
Kathmandu-Terai 35 months

Kathmandu-Terai Fast Track (Expressway) - Lot 04

Client: Kathmandu-Terai/Madhesh Fast Track (Expressway) Road Project

Construction of Roadway excavation, road way Embankment Construction, cross drainage structure and other structure's construction. Lot 04 features extensive rock cutting and stabilization.

ExpresswayView Details
Construction of North South (Koshi) Road Pejung-Hatiya Section
Roads
Sankhuwasabha 52 months

Construction of North South (Koshi) Road Pejung-Hatiya Section

Client: North South (Koshi) Road Project

Earthwork for Track opening and structural works along Pejung Hatiya Section (Ch 107+000 to 122+140). This project is critical for border connectivity in East Nepal.

RoadsView Details
Shahigaun-Ramagad Road Upgrading, Dailekh
Roads
Dailekh 28 months

Shahigaun-Ramagad Road Upgrading, Dailekh

Client: Pushpalal (Mid Hill) Highway Project Office

Widening and Upgrading of Road to Black Top standard along Shahigaun-Ramagad Road (14+000 to 26+000 Km). Involves high-altitude road engineering and surface treatments.

RoadsView Details
North South (Koshi) Road Handak Khola Section
Roads
Sankhuwasabha 76 months

North South (Koshi) Road Handak Khola Section

Client: North South (Koshi) Road Project

Earthwork for Track opening with structure works form Handak Khola (118+400) to Chaymtang Bhir (135+ 140). Heavy duty track opening in extremely fragile mountain terrains.

RoadsView Details
Lohore-Dailekh-Chakatra-Rawatkot Road (CH 10-20)
Roads
Dailekh 38 months

Lohore-Dailekh-Chakatra-Rawatkot Road (CH 10-20)

Client: Puspalal (Mid Hill) Highway Project Office

Widening and Upgrading of Road to black top standard along Lobore-Dailekh-Chakatra-Rawatkot Road (CH-10+000 to 20+000). Modernizing the vital connectivity of Mid-Hill region.

RoadsView Details
Shivam Cements Chapki Mining Site Development
Industrial
Makwanpur 34 months

Shivam Cements Chapki Mining Site Development

Client: Shivam Cements Ltd.

Sukaura-Thingan VDC situated Chapki Mining Site for Limestone Production, Collection and Transportation, Road Construction and Upgrading works. Essential for raw material logistics of Shivam Cements.

IndustrialView Details
Hile-Leguwa Sector Road Works, Dhankuta
Roads
Dhankuta 73 months

Hile-Leguwa Sector Road Works, Dhankuta

Client: Pusaplal (Midhill) Highway Project Office

Earthworks, Structural works, Cross Drainage works and pavement at Hile-Leguwa Sector (Ch 0+000 to 13+000 Km). Upgrading the Eastern Hill corridor.

RoadsView Details
Beni-Jomsom Korolla Road Upgrading, Mustang
Roads
Mustang 65 months

Beni-Jomsom Korolla Road Upgrading, Mustang

Client: Kaligandaki Corridor (Beni Jomsom Korolla Road Project)

Upgrading and improving of Beni-Jomsom Korolla Road (0+000 -19+000). A high-altitude project in the Mustang district facing extreme weather conditions and logistics.

RoadsView Details
Ghar Khola Khiwang Sikha Ghodepani Road
Roads
Myagdi 55 months

Ghar Khola Khiwang Sikha Ghodepani Road

Client: Government of Nepal

For construction of Ghar Khola Khiwang Sikha Ghodepani Road, Myagdi. Connecting remote trekking routes to the national road network.

RoadsView Details
Lohore-Dailekh-Chakatra-Rawatkot Road (CH 20-29.5)
Roads
Dailekh 36 months

Lohore-Dailekh-Chakatra-Rawatkot Road (CH 20-29.5)

Client: Puspalal (Mid Hill) Highway Project Office

Widening and Upgrading of Road to black top standard along Lohore-Dailekh- Chakatra- Rawatkot Road (CH-20+000 to 29+500). Completing the loop for Dailekh's regional highway.

RoadsView Details